The Structural Engineer's Corner

Eng. Onorio Francesco Salvatore

Methods of Structural Analysis according to AS 4100 – Part 1: General

Written By: Lexatus - Sep• 14•13

PDelta

This post provides guidance on calculating design action effects as required by AS 4100. The methods of analysis recognized by AS 4100 are:

(a) first-order elastic analysis with moment amplification (Clause 4.4.2 of AS 4100)

(b) second-order elastic analysis (Appendix E of AS 4100)

(c) plastic analysis with moment amplification (Clause 4.5 of AS 4100), and

(d) advanced analysis (Appendix D of AS 4100).

These four methods consider the interaction of load and deformation that produce second-order effects. From an AS 4100 perspective, (more…)

The Form Factor for local buckling as per Australian Standard 4100

Written By: Lexatus - Sep• 12•13

Buckling - Onorio

The form factor (kf) is defined in Clause 6.2.2 of AS 4100. Kf is used to determine the design section capacity of a concentrically loaded compression member (φNs).

The calculation of kf (more…)

Il progetto Adelaide East – West Bus Corridor in South Australia

Written By: Lexatus - Sep• 03•13

O-Bahn Onorio

Ancora news, ancora Australia. Questa volta si parla del Progetto Adelaide East – West Bus Corridor e’ promosso dal Governo del South Australia e ha un valore di circa 350 milioni di dollari.
Il progetto punta a (more…)

Il progetto Ipswich Motorway – Rocklea to Darra – Queensland

Written By: Lexatus - Sep• 03•13

Queensland - Onorio

Di seguito vi e’ un altro articolo per la sezione News, ancora dall’Australia, ancora in ambito business.

Il progetto Ipswich Motorway – Rocklea to Darra e’ promosso dal Governo del Queensland e ha un valore stimato di 558 milioni di dollari.
Questo progetto punta a (more…)

Il progetto Brisbane TransitWays – Chermside, Carindale, Brisbane

Written By: Lexatus - Sep• 02•13

Brisbane

Il miglioramento dei collegamenti tra le aree ad alta crescita di Chermside e Carindale con il Central Business District di Brisbane e’ un passo importante nel supportare la crescita sostenibile in una delle principali citta’ australiane.

Il progetto Brisbane TransitWays mira a (more…)

I progetti High Street to Warrigal Road (A$ 19.7 milioni) e Warrigal Road to Clyde Road (A$ 137.1 milioni) – Victoria

Written By: Lexatus - Sep• 02•13

Infrastructures Australia 2 - Onorio

Continuiamo a dare seguito alla neonata sezione News con un programma nazionale per le autostrade del Victoria che si aspetta possa incrementare la produttivita’ statale tramite un migliore uso degli asset infrastrutturali esistenti.

Il programma cerca di migliorare la capacita’ e la sicurezza delle autostrade esistenti impiegando le tecnologie a disposizione anziche’ optare per un’espansione delle infrastrutture.

La Monash Freeway provvede ad un collegamento strategico tra (more…)

Brisbane Cross River Rail Project – Queensland Government

Written By: Lexatus - Sep• 01•13

Cross River Rail Brisbane - Onorio

The Cross River Rail project aims to provide necessary infrastructure that will support the transformation of Brisbane into an internationally competitive city.

The Cross River Rail project is aimed at increasing rail capacity across the whole of Brisbane’s urban rail network to meet forecast demand and promote sustainable urban development. South east Queensland’s population is projected to grow from around 3 million in 2009 towards 4.4 million in 2031.

This core project forms (more…)

Il progetto Pilbara Cities in Australia

Written By: Lexatus - Sep• 01•13

Port Hedland - Onorio

Il piano Pilbara Cities e’ stato lanciato dal Governo del Western Australia nel 2009 per incrementare la popolazione di Karratha e Port Hedland a 50,000 abitanti ognuna e quella di Newman a 15,000 abitanti per il 2035, cosi’ come la crescita di altre aree minori.

Piu’ di 1 miliardo di dollari di fondi e’ stato allocato al programma. (more…)

Il Piano Nazionale per le Infrastrutture in Australia

Written By: Lexatus - Sep• 01•13

Infrastructures Australia 1 - Onorio

Questo articolo inaugura la sezione News; in questa sezione si tratteranno notizie provenienti da tutto il mondo e riguardanti il mercato dell’Engineering & Constructions.
Vi sara’ un focus particolare sull’Australia (paese in cui mi trovo attualmente per lavoro) e sulle infrastrutture civili.

In questo primo articolo trattiamo del Piano Nazionale per le Infrastrutture in Australia. (more…)

Dinamica delle esplosioni XVIII: Valutazione dei carichi di blast su un edificio (tetto)

Written By: Francesco Salvatore Onorio - May• 24•12

Torniamo sul nostro edificio di esempio per calcolare gli effetti dell’onda di blast sul tetto, dopo aver calcolato cosa accade alla parete laterale. Ricordiamo i dati di progetto:

edificio parallelepipedo con base  B = 30 m,  altezza H = 5 m e  profondità L = 20 m, sottoposto all’esplosione di una carica di TNT di 6150Kg posta sul terreno a circa 90 m di distanza  dal centro d della base B (ACSE 1997).

Il tetto è praticamente un piano e si calcola come la parete laterale. Tenuto conto dell’opportunità di  considerare una striscia di tetto larga 1m e di lunghezza L1 = 2,5 m, pari alla campata dei travetti, si ottiene (more…)